RBX7 / 40000 servers / RBX7-00A / RBX7-00B
RBX7: in progress
capacity 40000 servers
DC RBX7: first phase with 2x 20kV, A + B
2 routing room RBX7-00A, RBX7-00B, 1 cage for servers, 1 cage for the cooling system (watercooling + aircooling)
DC Roubaix Valley: RBX7
capacity 40000 servers
DC RBX7: first phase with 2x 20kV, A + B
2 routing room RBX7-00A, RBX7-00B, 1 cage for servers, 1 cage for the cooling system (watercooling + aircooling)
DC Roubaix Valley: RBX7
RBX7 in progress
RBX7 in progress… just an another DC in Roubaix Valley for 40000 servers
DC in Roubaix Valley: the fibers RBX4 RBX7
RBX7
Читать дальше →
DC in Roubaix Valley: the fibers RBX4 RBX7
RBX7
Читать дальше →
building "high voltage" for GRA2
DC Gravelines,FR: building «high voltage» for GRA2
GRA2 with dedicated 225kV for 100K servers / GRA1 90% production
DC Gravelines,FR: We are building next step of the DC Gravelines,FR #GRA2 with dedicated 225kV for 100K servers
90% of the GRA1 is the production
DC GRA1 in Gravelines, FR
90% of the GRA1 is the production
DC GRA1 in Gravelines, FR
DC Virginia: the network room is done. This week the DC should be connected to the backbone :)
DC Virginia: the power supply for the phase 1 / roof upgrade / switch/ Room 0B / cooling system
DC Virginia: the power supply for the phase 1
DC Virginia: the roof upgrade is 40% done
switch on, switch off, switch on, it works
DC Virginia: testing UPS for the Network Room 0B… 15m17… not so bad
DC Virginia: testing UPS for the Network Room 0B… 15m17… not so bad
DC Virginia: deploying the cooling system
DC Virginia: the roof upgrade is 40% done
switch on, switch off, switch on, it works
DC Virginia: testing UPS for the Network Room 0B… 15m17… not so bad
DC Virginia: testing UPS for the Network Room 0B… 15m17… not so bad
DC Virginia: deploying the cooling system
SBG1/1+/2/3/4 90000 servers / SGB4 100000 servers / SBG3 for 40000
DC we build the extension of the SBG1 (called SBG1+) then we start SBG3. End of 2017 SBG's capacity: (SBG1/1+/2/3/4): 90000 servers
Strasbourg France: upgrade SBG1+ while the SBG3 is built
DC SGB1 + SBG2 + SGB3 (in progress) + SGB4 = 100000 servers
build SBG3 for 40000 servers
Strasbourg France: upgrade SBG1+ while the SBG3 is built
DC SGB1 + SBG2 + SGB3 (in progress) + SGB4 = 100000 servers
build SBG3 for 40000 servers
DC Virginia: the rooms, 2000 servers each / rooms
E3-1270v6 и E3-1230v6
Добавлены новые процессоры в линейке Энтерпрайз (раньше там не было vrack кстати, но похоже теперь каждый новый тариф OVH будет с vrack по умолчанию)
www.ovh.ie/dedicated_servers/enterprise/
И новые модели Инфраструктуры
www.ovh.ie/dedicated_servers/infra/
www.ovh.ie/dedicated_servers/enterprise/
И новые модели Инфраструктуры
www.ovh.ie/dedicated_servers/infra/