+2 new gen for SBG1+ SBG3
soon the roof of the new SBG3 will be done
C Strasbourg,France: soon the roof of the new SBG3 will be done
DC Strasbourg,FR
SBG3 last level
DC Strasbourg,FR: SBG3 last level
SBG1/2/4 is closed to be full
DC Strasbourg,FR: 4th floor of SBG3
SBG3
DC Strasbourg,FR: lot of cables to connect the DC SBG3 to the power 20KV and the network's backbone