soon the roof of the new SBG3 will be done SBG datacentre, EU Central [FR, Strasbourg] C Strasbourg,France: soon the roof of the new SBG3 will be done
SBG1/2/4 is closed to be full SBG datacentre, EU Central [FR, Strasbourg] DC Strasbourg FR: SBG1/2/4 is closed to be full SBG3 is ready in 2 months Читать дальше →
SBG3 SBG datacentre, EU Central [FR, Strasbourg] DC Strasbourg,FR: lot of cables to connect the DC SBG3 to the power 20KV and the network's backbone